La Salle Apartments 2005 Restoration
October/November photo gallery
click photos to enlarge and then your browser back button to return
The new walls and ceilings are now up at the La Salle. Above, from left to right, are views of a bathroom (medicine cabinet will fill the hole), living room, bedroom and outer hallway.
The baseboards along with the door and window trim, shown stacked at far left, is being reinstalled. The surviving original kitchen cabinets, seen in the middle photos, and the newly made matching replacements, shown at right, are ready to be put up.

During the final phase of our restoration, tile countertops will be made for the kitchens, the hardwood floors will be refinished, walls and ceillings will be painted, and the appliances and fixtures will be installed. All in time for the new year. Pre-leasing is now underway!
Use the "Contact Us" button to send an e-mail or call Suzy at (214)850-3408 for leasing information.
March photos
April photos
May photos
June photos
July photos
August/September
December